Saturday, 23 August 2008
2012 Olympics Aquatic Centre
When ever a country hosts the olympics there is always a massive rush to get the building finished in time and within budget.
It is fantastic that London is hosting the 2012 Olympics and we have done so well in the Beijing Olympics it will be a great event, but there is talk of our aquatic centre, how much is rumoured to cost and will it be finished on time?
Well here in Belfast we have the answer - we have spent our £102 million pounds on our aqautic centre and it can be filled with 22 million gallons of water in just minutes.
Although I actually lie, this is the main Belfast to Dublin road as it runs through Belfast, a brand new underpass, that simply filled with water when it rained.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment